Full Address: Hillcrest Rd, Keyworth, Nottingham NG12 5JH, UK
Site: 2 Hillcrest Road
Equipment: Klargester BA Biodisc
Description:
Eurotech were booked to attend with us on 8th May but they went yesterday in error so I have moved this forward as the unit has been flooded. Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred. Desludge is based on a 6 wheeler tanker able to gain access and hard standing within 30m. Upto 1000 gallons included.
Equipment: Septic tank converted into a treatment plant
Description:
Please accept our below quote for a service visit on your converted septic tank. This service includes one wastewater engineer attending onsite for up to one hour, along with all travel and mileage costs. If any additional parts or labour are required, these will be discussed and agreed with you onsite before any extra costs are incurred. If you have any questions or need further information, please don’t hesitate to contact us on 01773 767612 or via email at enquiries@hec.co.uk. Thank you for your continued custom.
Full Address: Penrhos Terrace, Brynsiencyn, Llanfairpwllgwyngyll LL61 6NX, UK
Site: Dolwaenydd - C1193
Description:
Site Address - Penrhos Terrace, Brynsiencyn, Llanfairpwllgwyngyll LL61 6NX Your routine service for your off-mains drainage system is due in May 2026. This service includes one wastewater engineer attending onsite for up to one hour, along with all travel and mileage costs. If any additional parts or labour are required, these will be discussed and agreed with you onsite before any extra costs are incurred. We will contact you over the coming weeks to arrange a convenient date to ensure your system is serviced on time. If you have preferred dates, please let us know by accepting the quotation and entering your availability. If you have any questions or need further information, please don’t hesitate to contact us on 01773 767612 or via email at enquiries@hec.co.uk. Thank you for your continued custom.
Owners may not be in but happy for us to proceed. Goldstar service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Period 2 of 3 - 10/06/2025 to 09/04/2026
Meeting ET on site at approx 10-10.30am - PO 7626 1No engineers on site for up to two hours 1No Replacement brass swing check valve 1No Replacement ksb pump De-sludge for up to 1000g Extra high pressure jetter on site for up to an hour
Full Address: Calow Ln, Calow, Chesterfield S44 5XQ, UK
Site: Little Halt Cottage
Equipment: BioDisc
Description:
Booked for AM Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Barns Close Quarry, Leigh upon Mendip, Radstock, BA3 5QG
Site: Barns Close Quarry,
Equipment: Pump Station
Description:
Service on behalf of DP&T - Customer requested after 2pm if we can, if not her builders are on site Please ID the pumps as not been here before and we also need a photo of the pumps out please
Full Address: West End, Stagsden, Bedford MK43 8SY, UK
Site: Nine Ashes
Equipment: Tricel UK 6
Description:
*paid via WP* Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: 111a Station Road, Okehampton, Devon EX20 1EH
Site: 111a Station Road
Equipment: Pump Station
Description:
Service booked on behalf of DPT - Booked for AM I should add that we live down a fairly steep lane, behind house number 111. It is best if you reverse down the lane into our drive. What3Words... ///stunning.escorting.sandals
Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Whitehaven, Leek Road, Longston ST9 9QF
Site: Whitehaven
Description:
Following our recent compliance inspection at Whitehaven, Leek Road, Longston (ST9 9QF), we can confirm that the existing Marsh Ensign 12 sewage treatment plant is suitably sized for the property and current usage. However, the system is currently non-compliant due to two key issues identified during the visit. The first issue is dealt with separately in the quote concerning the power supply to the compressor. The second issue concerns surface water is entering the foul system via a downpipe connected near the kitchen area, which is not permitted under the General Binding Rules. Further remedial action includes diverting the existing downpipe away from the foul drainage system and reconnecting it to the guttering on the conservatory.
Full Address: Whitehaven, Leek Road, Longston ST9 9QF
Site: Whitehaven
Description:
Following our recent compliance inspection of the sewage treatment plant serving Whitehaven, Leek Road, Longston, ST9 9QF and The Old Post Office (known as Sutherland House, Sutherland Road, Longsdon ST9 9QD), we can confirm that the existing Marsh Ensign 12 sewage treatment plant is suitably sized for the properties and current usage. However, the system is currently non-compliant because there is no power supply to the compressor, meaning the unit is not carrying out the required biological treatment process and is effectively operating as a septic tank. To bring the system into full compliance, remedial works are required which include installing a suitable electrical supply to the treatment plant, fitting a rotary isolator, and connecting and commissioning the compressor to ensure proper operation. This involves a cable run of approximately 80 metres to the garage of Whitehaven. In addition, works will be required to supply and install associated components such as airline pipework, fittings, and potentially a replacement compressor (subject to testing the existing unit), along with a suitable housing. It is also recommended that the system is desludged due to the lack of treatment to date, and a check should be carried out to confirm whether a vent stack is present, with installation quoted if required. Once these works have been completed, the sewage treatment system will be fully operational and compliant with the General Binding Rules 2023, with no further issues identified at the time of the inspection.
2no engineers on site for up to four hours Tanker to remove up to 4000g Extra high pressure jetter on site for up to an hour 1no lithium grease 1no bearing and housing kit