Full Address: Waterloo Rd, Edgmond, Newport TF10 8EW, UK
Site: 14 Waterloo Road
Equipment: Harlequin Continuous Aeration Plant
Description:
Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Bracken Rd, Long Eaton, Nottingham NG10 4DA, UK
Site: Brackenfield Special School
Equipment: Twin Pump Station
Description:
Callout to Pump not working again and bad smells - booked for am. I've agreed with Marie we will attend FOC unless this is another issue of toys, rags etc in the unit. CK to email Marie for a PO if needed.
Full Address: Cornmill Cl, Warmingham, Sandbach CW11 3NH, UK
Site: 5 Cornmill Close
Equipment: Aeration STP and pump station
Description:
Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Whitwick Business Centre Stenson Road Coalville Leicestershire LE67 4JP
Description:
Site address: 1 - 7 Gwens Grove, Bearley, Stratford-upon-Avon CV37 0TR Callout to your off mains drainage system to bad smells and alarm going off Includes one hour onsite. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: 1 - 7 Gwens Grove, Bearley, Stratford-upon-Avon CV37 0TR, UK
Site: Gwens Grove
Equipment: Pump station
Description:
Site address: 1 - 7 Gwens Grove, Bearley, Stratford-upon-Avon CV37 0TR Callout to your off mains drainage system to bad smells and alarm going off Includes one hour onsite. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
The tank is under a decking lid on the lawn. The control box is next to it. Owner not home but permission given to proceed. Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Please make sure you sign in at reception- Ssc March 2026 Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Gatehouse Farm, Goddards Green, Hassocks BN6 9LE, UK
Site: Plot 5
Equipment: FujiClean CEN 5
Description:
Further to your recent enquiry, please see below our various commission options available. Bronze Commission To include up to one hour onsite, including: • Check and sign off a standard residential sewage treatment system installation • Commission Certification to validate your warranty
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Julian Rd, West Bridgford, Nottingham NG2 5AL, UK
Site: 113 Julian Road
Equipment: Single Surface water PS - Outside
Description:
Awaiting customer to confirm which PS - booked for 8am - Float is kicking in but the pump is whirling around rather than pumping down, customer has turned on/off a few times and it starts up but doesn't wantto keep doing this
Callout to broken chain and service - please take chain from remedials shelf and a motor just incase. Customer has since reported a crack in the tank, please take all details for repairing this. Site are unable to provide a jetter so please take pressure washer and hosepipe reel to wash down. Also please ensure you have all confined space equipment as site requires this.
Full Address: Church St, Church Gresley, Swadlincote DE11 9NP, UK
Site: St George's CE Primary School
Equipment: Twin crude pump station
Description:
Must be before 12 - Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.