Full Address: 7 Harts Hole Ln, Golcar, Huddersfield HD7 4NN, UK
Site: 7 Harts Hole Lane
Description:
MEET EUROTECH AT 8AM - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level
Full Address: Ranksborough Hall, Langham, Oakham LE15 7EJ, UK
Site: Ranksborough Hall
Equipment: Pump Station
Description:
Go ahead received but still awaiting PO - would like to book for March time** Site address: Ranksborough Hall, Langham, Oakham LE15 7EJ 1No New 3 phase control panel with pump run and warning lights (as per Rob email 29/1, use panel labelled Haythorne) 1No External red beacon to suit 1No New Isolator Up to 2m of new cable 2No New float brackets 4No Control floats 1No Waste water Engineer on site for up to 4 hours
Equipment: BUILDERS YARD - BALMORAL HYDROCLEAR 12 POP
Description:
Site address: Arkwright Hill Farm, BUILDERS YARD - BALMORAL HYDROCLEAR 12 POP 1No Klargester control panel 1No Klargester beacon 1No Waste water Engineer on site for up to 2 hours SITE HAS SORTED TANKER AND JETTING THEMSELVES AFTER SERVICE WAS CARRIED OUT.
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Green Lane, West Horsley, Woking, Surrey, GU23 6PQ
Site: Oakland Farm
Equipment: Twin Pump Station
Description:
Callout to red light flashing and have recieved reports of drains being blocked. Please provide us with a detailed report and any evidence photos etc of the cause of this issue. Customer has arranged there own tanker for today. DO NOT DISCUSS ANYTHING WITH PEOPLE ON SITE AS THIS IS A 'SENSITIVE MATTER'. Work Order: 492052-229324
Sample- Influent and effluent sample same as the other fuji's and please ensure the "eel catcher” is checked on the outlet each time Leave in sample fridge for testing
Full Address: Troutbeck, Windermere LA23 1PH - W3W – anguished.pipeline.shell
Site: Troutbeck
Description:
Sample visit and meet with UU / C2V representatives onsite at 8.30am to discuss potential recent issues. TAKE MANHOLE COVER FROM REMEDIAL SHELF AND LEAVE ON SITE! Fuji sample - Influent and effluent Please take checklist and complete one on each visit - Photo of this must be submitted on each visit Take sample and influent and effluent to be brought back to the Office for testing Please complete the checklist within the kiosk on each visit. A photo of the completed check list must be sent through after each sample visit
Full Address: Station House, Macclesfield SK11 0QU, UK
Site: Station House
Equipment: Septic Tank
Description:
Booked for 8am Thank you for your recent enquiry for a sewage system compliance/condition check. You have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. If you have had any issues in the past with your unit, we would recommend that you have a desludge of the system at the time of our visit as a minimum. Please speak to us if you are not sure what level of survey is required.
Return trip to lift decking Goldstar service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage.
MEET CAMION 8AM Thank you for your recent enquiry for a sewage system compliance/condition check along side the tank empty. We have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level - Asses the size of your system Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. If you have had any issues in the past with your unit, we would recommend that you have a desludge of the system at the time of our visit as a minimum. This is to be rescheduled from the December visit.
Full Address: Buddon Ln, Quorn, Loughborough LE12 8AA, UK
Site: 28 Buddon Lane
Equipment: Single Crude Pump Station - 501SE
Description:
*To be completed when the weather is drier and temps above 5deg* 1no Steel Lidded Manhole Cover and Frame Concrete, lintels and MOT crushed aggregate to suit 1No Waste water Engineer on site for up to 4 hours
Meeting ET at 8am PO 006967 4no Radial Arm Bolts Bolts to suit 1No New Support shaft 1No New Bottom pulley Tanker to remove up to 1000 gallons Up to 1 Hour of high pressure jetting 2No Waste water Engineers on site for up to 4 hours
Full Address: 45 Thorpe Ln, Middleton, Leeds LS10 4EP, UK
Site: 45 Thorpe Lane
Equipment: Septic tank
Description:
CUST ASKED FOR 10AM Speak with Kirsty prior to visit. Thank you for your recent enquiry for a sewage system compliance/condition check. You have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. If you have had any issues in the past with your unit, we would recommend that you have a desludge of the system at the time of our visit as a minimum. Please speak to us if you are not sure what level of survey is required.