Only take 1 van to site please Meeting lay by good signal here also - surnames.wriggle.awesome Site visit to take 4 x samples - RBC In , Splitter , Eff unit 1 & Eff unit 2 Please use historic bottles where poss to save waste Padlock gate code 1984 Key box code 1984 Take samples , general overview of site , check our kiosks / panels for faults Take a pic of samples and a couple of pics of site and whatsapp to Rob as soon as left site Samples to be left in sample fridge at Clay Cross
Chris Britland - Address: Hatchaway, Earl Sterndale, Buxton, SK17 0EP Marsh 3800 L Shallow septic tank Section 50/106 - N/A EA Permit - N/A Included - Building Control Electrician - N/A Tanker - 1000G included Spoil Removal - grab - 1x Included Decommission - Included and fill old old tank with spoil
Full Address: Woodham Mortimer, Maldon CM9 6TB, UK
Site: The Willows
Equipment: FA BioDisc and Effluent pump station
Description:
GSSC Callout - unit rotating but PS filling up, they are arranging their own tanker to fully empty prior to our visit. Please use hosepipe on site to make sure drains incoming and outcoming are running
Full Address: High St, Newington, Sittingbourne ME9 7JJ, UK
Site: 107 High Street
Equipment: Single Crude Pump Station
Description:
Following our engineer’s recent site visit, please find the quotation below for the replacement of the floats within the pump station, as well as the installation of a new control panel and beacon.
Full Address: Tunnel Rd, Windy Ridge, Beaminster DT8 3SP, UK
Site: Mountjoy School site
Equipment: Pump station
Description:
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. SITE: Mountjoy School, Tunnel Road, A3066, Beaminster DT8 3HB Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred. SITE: Beaminster Secondary School, Newtown, Beaminster DT8 3EP
Full Address: Pilsley Rd, Lower Pilsley, Chesterfield S45 8DL, UK
Site: Tethers End
Equipment: Marsh Ensign 6 with pumped outlet
Description:
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Hampton Loade, Bridgnorth WV16 6BN, UK
Site: The Railwaymans Retreat, WV16 6BN
Equipment: Tricel Nova UK 30
Description:
Booked for arrival between 12-2pm, Alan is away but please call Roger should you need anything 07531 801435 Repair Kit for LAM-150 / LAM-200 - FOR PRODUCTION MODELS FROM MAY 2015 1eng, 1 hour
Booked for 8-9am Carry out bronze commission including fitting of below parts: 1xWiska Combi Junction Box Glands to suit 1x MPC Float Bracket with Chain hooks Bronze Commission to include- To include up to one hour onsite, including: • Check and sign off a standard residential sewage treatment system installation • Commission Certification to validate your warranty
Further to our Engineers recent site visit he found that the drive chain within the system is in poor condition and requires replacement. Up to 2.5m of new drive chain 1No Split link to suit 1No Waste water Engineer on site for up to 1.5 hours
Site address: EKFB Greatworth Green Tunnel Compound, Culworth, Banbury OX17 2HL 8No Bearing greasomatics 1No New Sludge return pump Tanker to remove up to 10000 gallons Up to 2 hours of high pressure jetting 2No Waste water Engineers on site for up to 3 hours
Full Address: Wilsthorpe Rd, Long Eaton, Nottingham NG10 4AA, UK
Site: West Park
Description:
Callout - There is a loud buzzing noise coming from the pump house and all the warning lights are lit up on the control panel - FRONT OF THE PANEL SHOWS HIGH LEVEL AALARM
MEET EUROTECH AT 8AM - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level