Flashing red light on system but this just looks like a service due light from previous visits. Please re set and make sure everything is ok. Booked for Monday, no time given.
Equipment: 1500mm Dia x 3500mm Deep Pump Chamber, Pump - Hippo 75
Description:
2000G - Eurotech PO006306 Jetter 4 x SS M10 X 30mm hex bolts - Engineer to sort please M8 hex bolts just in case - Engineer to sort please 2Eng 1.5 hrs
Full Address: Castle View Road Bottesford Nottingham NG13 0DZ, UK
Site: Bottesford
Description:
System Cesspool: Marsh 7,000L shallow cesspit with standard invert and pedestrian-rated lid. Rainwater Harvester: RainBox Combi 8,000L single commercial rainwater harvesting unit with 110mm inlet filter, 110mm overflow (with backflow prevention), and 32mm pumped outlet to internal 500L tank. Installer Shaun Coupe Included Cesspool and Rainwater Harvester Installation: Excavation, shoring, concrete base (C30/70), water ballast, and full encasement with C25 semi-dry concrete. Reinforcement: Concrete lintels and D400-rated manhole lids for vehicular access protection. Electrical Works: Included (£350 + VAT) – high-level alarm power connection and Part P sign-off. High-Level Alarm: Included – with float, control, and bracket for cesspool. Spoil Removal Not included – £320 + VAT per load if required (may be distributed onsite). Building Control Not included – optional (£350 + VAT). Other Notes Ground conditions: running sand with trench collapse below 1m – shoring specified (Groundforce UK to confirm box design). Reinforced lids and lintels required due to proximity to access road. Rainwater harvester installed by MPC (tank only); all internal plumbing connections to be completed by others. Power to be taken from office building.
Full Address: Bishop's Offley, Stafford ST21 6EU, UK
Site: Lea Hall
Equipment: Marsh Ensign Sewage treatment system
Description:
NS Service 2025 - last serviced by MPC in 2023. Could you contact Tim on 07966314799 when you are at the gates so he can give you the code and directions to the tank please Customer noted 'I think an air pipe may have been disrupted when then tank was emptied please. Just so that’s specifically checked on the day (to make sure all airpipes are connected and working correctly.)'
Full Address: Burton upon Trent, Burton-on-Trent, UK
Site: Rolleston (A1576)
Description:
Price £14,585 + VAT (use existing outlet) Tank FujiClean CEN5 (7-person) sewage treatment plant with gravity outlet. Installer Shaun Coupe Section 50/106 Not applicable / not required for this project. EA Permit Required and included. Includes Environment Agency application fee (£125), admin fee (£120), and mapping/drawings (£405). Permit covers discharge via a seasonal drainfield to ditch. Included Building Control: Included (£650 + VAT). Electrician: Included (£350 + VAT) – final connection and Part P sign-off. EA Permit Application: Included – full preparation and submission handled by MPC. Spoil Removal: Included (£320 + VAT per load). Seasonal Drainfield: Included – stone, Terram, and slotted pipework. Tank Empty Emptying of existing septic tank optional – £265 NO VAT per 1,000 gallons if undertaken by MPC. Other Notes Property: Field Grove Farm (3-bedroom dwelling). Existing septic tank discharging to ditch – non-compliant under current General Binding Rules. New FujiClean system proposed with seasonal drainfield to allow infiltration and overflow to ditch. Power to be taken from house; free fuse spur confirmed. Access good via rear field – livestock to be moved during works. Existing septic tank to be broken in and backfilled with spoil/concrete pad.
Full Address: Dennis Eagle Ltd Witham 5 Stepfield Witham CM8 3TH
Site: Dennis Eagle Ltd Witham, 5 Stepfield
Equipment: Interceptor
Description:
Booked for midday - SITE HAVE ARRANGED OWN TANKER FOR 12 Ksb 501 SE Portable installation kit 3 meter length of 2 inch flexi 2 inch jubilee 3 m Lifting chain X2 D link 1 engineer 2 hours